Phase 9: Capstone — Ship a Real Project · 25 min · Any vibe coding tool
The Full Checklist Run
Two checklists, one framework, zero red lights. This is the gate between 'done building' and 'ready to ship.'
Hiring signal: What changes when you use this: you can verify your project is ready for production — which means you ship with confidence.
What you will learn
- Run the 10-point pre-deployment checklist
- Run the 7-point security checklist
- Apply the ship/no-ship framework
- Fix all red lights before deploying
- Verify minimum viable security
Your Mission
Run both checklists and the ship/no-ship framework on your capstone project. Output: full_checklist_run.md.
You need: A built capstone project (from Lesson 02).
Time: 30 minutes.
Step 1: Run the Pre-Deployment Checklist (10 min)
The checklist is your safety net
You've been building with review habits — catching red flags, verifying claims, testing features. The checklists are the final safety net. They catch anything you missed during building. Run them every time, even when you're 'sure' everything is fine.
Write in your file:
Unlock the full lesson
You've read the first 2 sections. The rest of this lesson covers Pre-Deployment Checklist (10 Points), Step 2: Run the Security Checklist (7 min), Security Checklist (7 Points), Step 3: Fix All Failures (5 min), Fixes Applied, Re-Run Confirmation, Step 4: Run the Ship/No-Ship Framework (5 min), Ship/No-Ship Framework, Step 5: Verify Minimum Viable Security (3 min), Minimum Viable Security, Step 6: Make the Decision (2 min), Decision, You're Done — plus a hands-on lab, quiz, and project artifact.
Create a free account to unlock Phase 0 and Phase 1 of every course — no credit card.
Browse all courses · View pricing · DeVenture Academy